The following tables summarize as at December 31, 2025 the Company's estimated mineral reserves and mineral resources on its material mineral properties and select non-material mineral properties, all of which are wholly owned.

Silver-Gold Proven and Probable Reserves (as of December 31, 2025)
Tonnes
(000s)
Ag
g/t
Au
g/t
Ag Eq
g/t
Ag
oz (000s)
Au
oz (000s)
Ag Eq
Oz (000s)
Guanaceví 152 361 0.87 439 1,767 4.2 2,149
Bolañitos 28 91 2.08 278 82 1.9 251
Total Proven 180 320 1.05 415 1,849 6.1 2,400
Guanacevi 261 326 0.76 395 2,742 6.4 3,317
Bolañitos 286 90 1.58 232 825 14.6 2,135
Terronera 7,077 200 2.22 375 45,513 505.4 85,386
Total Probable 7,624 200 2.15 371 49,080 526.4 90,838
Total Proven & Probable 7,804 203 2.12 372 50,929 532.5 93,238
Total Proven & Probable excluding Bolañitos (1) 7,490 208 2.14 377 50,022 516 90,852

1 In January 2026, the Company completed the sale of the Bolañitos mine

Silver-Gold Measured and Indicated Resources (as of December 31, 2025) Exclusive of Reserves
Tonnes
(000s)
Ag
g/t
Au
g/t
Ag Eq
g/t
Ag
oz (000s)
Au
oz (000s)
Ag Eq
Oz (000s)
Guanaceví 78 365 0.86 443 913 2.1 1,105
Bolañitos 67 137 2.81 390 296 6.1 842
Total Measured 145 259 1.76 418 1,209 8.2 1,947
Guanaceví 453 359 0.81 432 5,231 11.8 6,294
Bolañitos 994 107 2.20 305 3,420 70.4 9,758
Parral 433 271 0.00 271 3,773 0.0 3,773
Total Indicated 1,880 206 1.36 328 12,424 82.2 19,825
Total Measured & Indicated 2,025 209 1.39 334 13,633 90.4 21,772
Total Measured & Indicated excluding Bolañitos (1) 964 320 0.45 360 9,917 14 11,172

1 In January 2026, the Company completed the sale of the Bolañitos mine

Silver-Gold Inferred Mineral Resources (as of December 31, 2025)
Tonnes
(000s)
Ag
g/t
Au
g/t
Ag Eq
g/t
Ag
oz (000s)
Au
oz (000s)
Ag Eq
Oz (000s)
Guanaceví 501 436 0.83 511 7,029 13.3 8,227
Bolañitos 1,775 138 1.89 308 7,902 107.8 17,607
Terronera 968 218 1.92 370 6,801 59.7 11,513
Terronera (La Luz) 61 150 11.40 1,001 295 22.0 1,977
Parral 3,180 322 0.21 339 32,938 21.7 34,677
Total Inferred 6,485 264 1.08 355 54,965 224.5 74,001
Total Inferred excluding Bolañitos (1) 4,710 311 0.77 372 47,063 117 56,394

1 In January 2026, the Company completed the sale of the Bolañitos mine

Parral and Guanacevi Silver-Lead-Zinc Resources (as of December 31, 2025)
Resource / Deposit Tonnes (000s) Ag (g/t) Au (g/t) Ag Eq (g/t) Ag oz (000s) Au oz (000s) Ag Eq oz (000s) Pb (%) Zn (%)
Parral (Cometa) 180 55 1.17 149 320 6.8 860 3.2 3.3
Total Indicated 180 55 1.17 149 320 6.8 860 3.2 3.3
Guanaceví 613 198 0.22 294 3,893 4.4 5,795 1.03 1.89
Parral (Cometa) 880 74 1.45 190 2,100 41 5,376 3.27 3.24
Total Inferred 1,493 125 0.95 233 5,993 45 11,171 2.35 2.69
Pitarrilla Silver-Lead-Zinc Resources (as of November 1, 2025)
Cut-Off (AgEq) Domain/Area Resource Class MTonnes Grade Contained Metal
Ag (g/t) Pb (%) Zn (%) AgEq (g/t) Ag (Moz) Pb (Mlbs) Zn (Mlbs) AgEq (Moz)
50 g/t Oxide Indicated 70.6 108 0.10 0.42 120 244 158 659 272
Inferred 9.20 82.3 0.09 0.49 96.0 24.3 18.5 98.4 28.4
100 g/t Transition Indicated 18.4 141 0.48 1.11 176 83.3 196 449 105
Inferred 2.39 172 0.50 1.46 217 13.2 26.2 77.0 16.7
100 g/t HG Veins Indicated 8.49 215 1.42 3.20 319 58.8 266 599 87.1
Inferred 3.82 194 1.28 2.52 278 23.8 107 212 34.2
Sedimentary Breccia Indicated 16.7 118 1.02 1.62 175 63.3 376 598 94.2
Inferred 2.71 83.5 1.15 1.99 152 7.28 68.7 119 13.3
Andesite Breccia Indicated 1.97 123 0.51 1.26 163 7.74 21.9 54.7 10.3
Inferred - - - - - - - - -
Manto Indicated 10.6 120 0.82 3.20 214 40.6 191 745 72.6
Inferred - - - - - - - - -
Sulphide Total Indicated 37.7 141 1.03 2.40 218 170 855 1,996 264
Inferred 6.53 148 1.22 2.30 226 31.1 176 331 47.5
50 and 100 g/t Pitarrilla Total Indicated 127 122 0.43 1.11 157 498 1,210 3,104 641
Inferred 18.1 118 0.55 1.27 159 68.7 221 507 92.6
Pitarrilla Silver-Lead-Zinc Reserves (as of October 30, 2026)
Sulfide Domain Tonnage (kt) Grade
Ag (g/t) Pb (%) Zn (%)
Probable
Andesite Breccia 2,897 150 0.79 1.82
Manto 8,726 128 0.84 3.14
Sedimentary Breccia 13,455 134 1.07 1.79
Total 25,078 133 0.96 2.27

Notes to Mineral Resources and Reserves tables

  1. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that any or all part of the Mineral Resources will be converted into Mineral Reserves. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
  2. The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource with continued exploration.
  3. The Mineral Resources in this estimate were calculated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council.
  4. Mineral Resources are exclusive of and in addition to Mineral Reserves.
  5. Guanacevi Mineral Resource and Mineral Reserve are reported using multiple silver equivalent cutoffs based on concession area. Silver equivalent cut-off grades are 270 g/t for mineral resources located in the Alondra, El Curso, and Porvenir Frisco concession boundaries, and 207 g/t for all other concessions. Metallurgical recoveries were 87.7% silver and 91.9% gold for Guanaceví.
  6. The cutoff grade applied for resource calculation at the regional polymetallic projects at Guanacevi (Noche Buena and Buena Fe) is 207g/t silver equivalent. The silver equivalent is based on the calculated NSR for each element based on the following price assumptions US$30/oz for silver, US$2,500/oz for gold, US$0.93/lb for lead and US$1.25/lb for zinc.
  7. Bolañitos Mineral Resource and Mineral Reserve are reported using multiple silver equivalent cutoffs based on production area. Silver equivalent cut-off grades are 134 g/t for veins located in the La Luz and San Miguel production areas, 135 g/t for veins located in the Lucero production area, and 140 g/t for the remaining veins at Bolañitos. Metallurgical recoveries were 85.3% silver and 90.1% gold for Bolañitos.
  8. Terronera mineral reserves are reported using a silver equivalency cut-off formula AgEq (g/t) = Ag (g/t) + (Au (g/t) x 78.9474). Cut-off grade varies between 156 g/t to 200 g/t AgEq depending on mining method. Metal prices used were $1,500/oz Au and $19.00/oz Ag. Metallurgical recovery of 84.9% for silver and 79.8% for gold, transport, treatment and refining charges of $0.75/oz Ag, and NSR royalties of 2.5%. Mineral Reserves are reported based on mining costs of $30.00/t for sub-level open stoping, $49.18/t for cut and fill, $48.00/t for shrinkage mining, $28.46/t for process costs, and $8.49/t for G&A costs.
  9. Terronera mineral resources are constrained within a wireframe constructed at a nominal 150 g/t AuEq cut-off grade. A 150 g/t AgEq cut-off grade considers Wood’s guidance on industry consensus for long term silver and gold prices for Mineral Resource estimation, metallurgical performance, mining, processing, and site G&A operating costs, treatment and refining charges, and royalties. Mineral Resources are stated as in-situ with no consideration for planned or unplanned external mining dilution. The silver and gold ounces estimates presented in the Mineral Resource estimate table have not been adjusted for metallurgical recoveries.
  10. Parral Mineral Resources are estimated at a cut-off grade of 130 g/t AgEq for Palmilla, Veta Colorada, and San Patricio, 200 g/t Ag for Sierra Plata, and an NSR cut-off value of US$55/t for El Cometa. The NSR and AgEq values are based on estimated metallurgical recoveries, assumed metal prices and smelter terms, which include payable factors, treatment charges, penalties, and refining charges. Metal price assumptions were: US$17/oz Ag, US$1,275/oz Au, US$1.15/lb Zn, and US$1.00/lb Pb. A minimum mining width of 1.5 m was used for Sierra Plata, and 1.75 m for all other veins.
  11. Mining recovery of 93.00% was applied for Guanaceví; 90.88% for Bolañitos, and 90% (cut and fill), 95% (longhole), 80% (shrinkage) for Terronera for Mineral Reserve Estimate calculations. Minimum mining widths were 0.8 metres for Mineral Reserve Estimate calculations.
  12. Dilution factors for Mineral Reserve Estimate calculations averaged 28.00% for Guanaceví, 32.36% for Bolañitos, and 20% for Terronera. For current operations dilution factors are based on vein width diluted to width of drive for lateral sill preparation (generally >30%) and internal stope dilution calculations and external dilution factors of 24% for cut and fill mining and 40% for long hole mining.
  13. Silver equivalent grades are based on a 90:1 silver:gold ratio and calculated including only silver and gold. Silver equivalent grades for Terronera are based on a 78:9474 silver:gold ratio and calculated including only silver and gold.
  14. Indicated and Inferred Silver-Gold Mineral Resources for "Parral" includes the Colorada, Palmilla and San Patricio areas.
  15. The Veta Colorada structure (Parral) does not contain gold on an economic scale.
  16. Price assumptions for Guanaceví and Bolañitos, are US$30/oz for silver, US$2,500/oz for gold.
  17. Figures in tables are rounded to reflect estimate precision; small differences generated by rounding are not material to the estimates.

Notes on the Pitarrilla Resource Estimate

  1. The classification of the current Mineral Resource Estimate into Indicated and Inferred is consistent with current 2014 CIM Definition Standards - For Mineral Resources and Mineral Reserves.
  2. All figures are rounded to reflect the relative accuracy of the estimate and numbers may not add due to rounding.
  3. The mineral resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction.
  4. Mineral resources which are not mineral reserves do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
  5. The Project mineral resource estimates are based on a validated database which includes data from 863 surface and underground RC and diamond drill holes totaling 264,398 m. The resource database totals 148,241 assay intervals representing 206,146 m of drilling.
  6. The MRE for the Pitarrilla deposit is based on 24 three-dimensional (“3D”) mineral resource models.
  7. Grades for Ag, Pb and Zn were estimated for each mineralization domain using 1.52 m capped composites assigned to that domain. To generate grade within the blocks, the inverse distance squared (ID2) interpolation method was used for all domains. An average density value was assigned to each domain.
  8. It is envisioned that parts of the Pitarrilla deposit (oxide mineralization) may be mined using open pit mining methods. In-pit mineral resources are reported at a cut-off grade of 50 g/t AgEq. The in-pit Mineral Resource grade blocks are quantified above the base case cut-off grade, above the constraining pit shell, below topography and within the constraining mineralized domains (the constraining volumes).
  9. The results from the pit optimization are used solely for the purpose of testing the “reasonable prospects for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. The results are used as a guide to assist in the preparation of a Mineral Resource statement and to select an appropriate resource reporting cut-off grade.
  10. It is envisioned that parts of the Pitarrilla deposit (transition and sulphide mineralization) may be mined using underground mining methods. Underground (below-pit) Mineral Resources are estimated from the bottom of the pit (base of oxide mineralization) and are reported at a base case cut-off grade of 100 g/t AgEq. The underground Mineral Resource grade blocks were quantified above the base case cut-off grade, below the constraining pit shell and within the constraining mineral resource domains (considered mineable shapes).
  11. AgEq Cut-off grades consider metal prices of $38.00/oz Ag, $0.90/lb Pb and $1.40/lb Zn and considers variable metal recoveries for Ag, Pb and Zn: oxide and transition mineralization - 75% for silver, 70% for Pb and 65% for Zn; sulphide mineralization - 86% for silver, 91% for Pb and 85% for Zn. 
  12. The pit optimization and in-pit base case cut-off grade of 50 g/t AgEq considers a mining cost of US$2.20/t rock and processing, treatment and refining, transportation and G&A cost of US$27.00/t mineralized material, and an overall pit slope of 42°. The below-pit base case cut-off grade of 100 g/t AgEq considers a mining cost of US$70.00/t rock and processing, treatment and refining, transportation and G&A cost of US$35.00/t mineralized material.
  13. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

Notes on the Pitarrilla Reserve Estimate

  1. The effective date of the Pitarrilla Mineral Reserve estimate is October 30, 2026.
  2. Mineral Reserves are included within the estimated Mineral Resources. Mineral Reserves are reported on a diluted and recovered basis.
  3. The Mineral Reserve estimate was prepared under the supervision of Mr. Henri Gouin, P.Eng., SGS Geological Services, who is a Qualified Persons as defined by NI 43-101.
  4. Mineral Reserves are based on metal prices of US$38.00/oz Ag, US$1.40/lb Zn, and US$0.90/lb Pb.
  5. Metallurgical recoveries of 86% for Ag, 85% for Zn, and 91% for Pb were applied.
  6. The estimate of Mineral Reserves may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The Mineral Reserve Estimate is not a guarantee of economic viability.
  7. A mine design cut-off grade of 150 g/t AgEq (in situ) was applied to define reserve stopes. Incremental stope optimization was subsequently completed using a cut-off grade of 100 g/t AgEq.
  8. Mining recovery factors of 92% for downhole stopes, 85% for uphole stopes, and 55% for sill pillars were applied, resulting in an overall mining recovery of 89%.
  9. The Mineral Reserve estimate includes both planned and unplanned dilution. Planned dilution is incorporated directly into the Deswik stope shapes. Unplanned dilution consists of a 1 m stope wall overbreak allowance and an additional 2% backfill dilution allowance, resulting in an overall dilution factor of 16%.
  10. Totals may not sum due to rounding.

Qualified Person:

Guanacevi:

Richard A. Schwering SME-RM with Hard Rock Consulting, LLC (“HRC”), is responsible for the estimation of the mineral resource herein. Mr. Schwering is a qualified person as defined by NI 43-101 and is independent of EDR. Mineral Resources for the Guanaceví mine were estimated from drillhole and channel sample data, constrained by geologic vein boundaries using two methods. 3D block models were estimated using an ordinary kriging (“OK”) algorithm using Leapfrog Geo® and Leapfrog EDGE® software version(s) 2021.2.4 and 2021.2.5 (“Leapfrog”). Veins converted to 2D Vertical Longitudinal Projections (“VLP”) were estimated using polygonal methods. The metals of interest at Guanaceví are gold and silver.

Donald Gray, P.E., SME-RM, of EDR is responsible for the mineral reserve estimate presented in this report. Mr. Gray is a Qualified Person as defined by NI 43-101 and is not independent of EDR. The mineral reserves reported herein are classified as Proven and Probable according to CIM Definition Standards. The mineral reserve estimate for EDR’s Guanaceví Project has an effective date of May 31st, 2022. The mineral reserve estimate includes the Santa Cruz, El Curso and Milache areas of the mine and the ore stockpiles at the mill site. Stope designs for reporting the mineral reserves were created utilizing the updated resources and cutoffs established for 2022 by Richard A. Schwering SME-RM with Hard Rock Consulting, LLC (“HRC”). All stopes are within readily accessible areas of the active mining areas. Ore is processed in the on-site mill, leaching circuit and Merrill Crowe process capable of processing 1,300 tpd.

Bolanitos:

Richard A. Schwering SME-RM with Hard Rock Consulting, LLC (“HRC”), is responsible for the estimation of the mineral resource herein. Mr. Schwering is a qualified person as defined by NI 43-101 and is independent of EDR. Mineral resources for the Bolañitos mine were estimated from drillhole and channel sample data, constrained by geologic vein boundaries using two methods. 3D block models were estimated using an ordinary kriging (“OK”) algorithm using Leapfrog Geo® and Leapfrog EDGE® software version(s) 2021.2.4 and 2021.2.5 (“Leapfrog”). Veins converted to 2D Vertical Longitudinal Projections (“VLP”) were estimated using polygonal methods. The metals of interest at Bolañitos are gold and silver.

Mr. Don Gray, P.E., SME-RM, of EDR is responsible for the mineral reserve estimate presented in this report. Mr. Gray is Qualified Person as defined by NI 43-101 and is not independent of EDR. The reserve calculation for the Bolañitos Project was completed in accordance with NI 43-101 and has an effective date of May 31st, 2022. Stope designs for reporting the reserves were created utilizing the updated resources and cutoffs established for 2022 by Richard A. Schwering SME-RM with Hard Rock Consulting, LLC (“HRC”). All the stopes are within readily accessible areas of the active mining areas. Ore is milled and undergoes floatation at a rate of 1,100 tpd

Terronera

The technical report titled “NI 43-101 Technical Report on the Feasibility Study of the Terronera Project Jalisco State, Mexico - Amended” dated May 15, 2023, with an effective date of September 9, 2021, was prepared by Dale Mah, P.Geo., Vice President, Corporate Development of Endeavour and by Wood Canada Limited (“Wood”) and WSP Group, Inc. (“WSP”) under the direction of the following Independent Qualified Persons: Henry Kim, P.Geo. (Wood); James Tod, P. Eng. (WSP); Alan Drake, P.L Eng. (Wood); Kirk Hanson, P.E. (KH Mining LLC); Paul Ivancie, P.G.(WSP); and Humberto Preciado, P.E. (WSP).

Pitarrilla:

The Mineral Resource Estimate was prepared by the following qualified persons. Allan Armitage, Ph.D., P.Geo., of SGS Geological Services. Dr. Armitage completed site visits to the Project on April 14 and 15, 2024, September 23 and 24, 2025 and again on April 12 and 13, 2026. William van Breugel, P. Eng. is an associate engineer of SGS Geological Services, having responsibility for the project economics including capital expenditures, operating expenditures, financials and sensitivities. Johnny Canosa, P. Eng. of SGS Geological Services, having responsibility for the infrastructure, environment, permitting and social or community impact. Henri Gouin, P. Eng. of SGS Geological Services, having responsibility for the mining methods, underground mining planning and schedule. Mr. Gouin conducted a site visit on October 22 and 23, 2024. Shaohai Yu, P. Eng of SGS North America, having responsibility for the mineral processing, metallurgical testing and recovery methods. Mr. Yu conducted a site visit on September 23 and 24, 2025. Diego Cobos, PhD, of SRK Consulting (Colombia), having responsibility for the design of the tailings storage facility and associated water management structures. Mr. Cobos visited the project on 19-22 November 2024 and 16-18 March 2025.

All listed qualified persons are independent Qualified Persons as defined by NI 43-101.

Additionally:

Greg Blaylock P.E. (USA), and P.Eng. (Canada) has reviewed and approved the Updated Company Mineral Reserve and Resource Estimates Mining Operations and Infrastructure sections of the Terronera Mine as of December 31, 2025.

Richard A. Schwering, P.G., SME-RM of Hard Rock Consulting LLC is the Qualified Person who reviewed and approved the technical information contained in the Updated Company Mineral Reserve and Resource Estimates of the Guanaceví Mine and the Bolañitos Mine as of December 31, 2025. Dale Mah has reviewed and approved the balance of the technical and scientific information contained in this AIF.