• Advanced Exploration

Advanced Exploration | Pitarrilla

Pitarrilla, one of the largest undeveloped silver projects in the world, is expected to form one of the key cornerstones of Endeavour’s long-term growth profile.

Pitarrilla Project, Mexico

Pitarrilla is a large undeveloped silver, lead, and zinc project located 160 kilometres north of Durango City, in northern Mexico. The project is within the Municipality of Santa María del Oro and Indé on the eastern flank of the Sierra Madre Occidental mountain range. There are several mines in operation in Durango, including our Guanacevi mine, which has been in operation since 2005. The property comprises of 4,950 hectares across five concessions and has significant infrastructure in place with direct access to utilities, including access to the grid. A number of key permits are already in place for underground mining and development, including permits for water use and discharge, general use of explosives, change use of soil, as well, underground mining and development are permitted under an Environmental Impact Statement.

Pitarrilla Feasibility Study

Pitarrilla Silver-Lead-Zinc Resources (as of November 1, 2025)

Cut-Off (AgEq)

Domain/Area

Resource Class

MTonnes

Grade

Contained Metal

Ag (g/t)

Pb (%)

Zn (%)

AgEq (g/t)

Ag (Moz)

Pb (Mlbs)

Zn (Mlbs)

AgEq (Moz)

50 g/t

Oxide

Indicated

70.6

108

0.10

0.42

120

244

158

659

272

Inferred

9.20

82.3

0.09

0.49

96.0

24.3

18.5

98.4

28.4

100 g/t

Transition

Indicated

18.4

141

0.48

1.11

176

83.3

196

449

105

Inferred

2.39

172

0.50

1.46

217

13.2

26.2

77.0

16.7

100 g/t

HG Veins

Indicated

8.49

215

1.42

3.20

319

58.8

266

599

87.1

Inferred

3.82

194

1.28

2.52

278

23.8

107

212

34.2

Sedimentary

Breccia

Indicated

16.7

118

1.02

1.62

175

63.3

376

598

94.2

Inferred

2.71

83.5

1.15

1.99

152

7.28

68.7

119

13.3

Andesite

Breccia

Indicated

1.97

123

0.51

1.26

163

7.74

21.9

54.7

10.3

Inferred

-

-

-

-

-

-

-

-

-

Manto

Indicated

10.6

120

0.82

3.20

214

40.6

191

745

72.6

Inferred

-

-

-

-

-

-

-

-

-

Sulphide Total

Indicated

37.7

141

1.03

2.40

218

170

855

1,996

264

Inferred

6.53

148

1.22

2.30

226

31.1

176

331

47.5

50 and 100 g/t

Pitarrilla Total

Indicated

127

122

0.43

1.11

157

498

1,210

3,104

641

Inferred

18.1

118

0.55

1.27

159

68.7

221

507

92.6

Pitarrilla Silver-Lead-Zinc Reserves (as of October 30, 2026)

Sulfide Domain

Tonnage
(kt)

Grade

Ag (g/t)

Pb (%)

Zn (%)

Probable

Andesite Breccia

2,897

150

0.79

1.82

Manto

8,726

128

0.84

3.14

Sedimentary Breccia

13,455

134

1.07

1.79

Total

25,078

133

0.96

2.27

Notes on the Pitarrilla Resource Estimate

  1. The classification of the current Mineral Resource Estimate into Indicated and Inferred is consistent with current 2014 CIM Definition Standards - For Mineral Resources and Mineral Reserves.
  2. All figures are rounded to reflect the relative accuracy of the estimate and numbers may not add due to rounding.
  3. The mineral resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction.
  4. Mineral resources which are not mineral reserves do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
  5. The Project mineral resource estimates are based on a validated database which includes data from 863 surface and underground RC and diamond drill holes totaling 264,398 m. The resource database totals 148,241 assay intervals representing 206,146 m of drilling.
  6. The MRE for the Pitarrilla deposit is based on 24 three-dimensional (“3D”) mineral resource models.
  7. Grades for Ag, Pb and Zn were estimated for each mineralization domain using 1.52 m capped composites assigned to that domain. To generate grade within the blocks, the inverse distance squared (ID2) interpolation method was used for all domains. An average density value was assigned to each domain.
  8. It is envisioned that parts of the Pitarrilla deposit (oxide mineralization) may be mined using open pit mining methods. In-pit mineral resources are reported at a cut-off grade of 50 g/t AgEq. The in-pit Mineral Resource grade blocks are quantified above the base case cut-off grade, above the constraining pit shell, below topography and within the constraining mineralized domains (the constraining volumes).
  9. The results from the pit optimization are used solely for the purpose of testing the “reasonable prospects for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. The results are used as a guide to assist in the preparation of a Mineral Resource statement and to select an appropriate resource reporting cut-off grade.
  10. It is envisioned that parts of the Pitarrilla deposit (transition and sulphide mineralization) may be mined using underground mining methods. Underground (below-pit) Mineral Resources are estimated from the bottom of the pit (base of oxide mineralization) and are reported at a base case cut-off grade of 100 g/t AgEq. The underground Mineral Resource grade blocks were quantified above the base case cut-off grade, below the constraining pit shell and within the constraining mineral resource domains (considered mineable shapes).
  11. AgEq Cut-off grades consider metal prices of $38.00/oz Ag, $0.90/lb Pb and $1.40/lb Zn and considers variable metal recoveries for Ag, Pb and Zn: oxide and transition mineralization - 75% for silver, 70% for Pb and 65% for Zn; sulphide mineralization - 86% for silver, 91% for Pb and 85% for Zn. 
  12. The pit optimization and in-pit base case cut-off grade of 50 g/t AgEq considers a mining cost of US$2.20/t rock and processing, treatment and refining, transportation and G&A cost of US$27.00/t mineralized material, and an overall pit slope of 42°. The below-pit base case cut-off grade of 100 g/t AgEq considers a mining cost of US$70.00/t rock and processing, treatment and refining, transportation and G&A cost of US$35.00/t mineralized material.
  13. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

Notes on the Pitarrilla Reserve Estimate

  1. The effective date of the Pitarrilla Mineral Reserve estimate is October 30, 2026.
  2. Mineral Reserves are included within the estimated Mineral Resources. Mineral Reserves are reported on a diluted and recovered basis.
  3. The Mineral Reserve estimate was prepared under the supervision of Mr. Henri Gouin, P.Eng., SGS Geological Services, who is a Qualified Persons as defined by NI 43-101.
  4. Mineral Reserves are based on metal prices of US$38.00/oz Ag, US$1.40/lb Zn, and US$0.90/lb Pb.
  5. Metallurgical recoveries of 86% for Ag, 85% for Zn, and 91% for Pb were applied.
  6. The estimate of Mineral Reserves may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The Mineral Reserve Estimate is not a guarantee of economic viability.
  7. A mine design cut-off grade of 150 g/t AgEq (in situ) was applied to define reserve stopes. Incremental stope optimization was subsequently completed using a cut-off grade of 100 g/t AgEq.
  8. Mining recovery factors of 92% for downhole stopes, 85% for uphole stopes, and 55% for sill pillars were applied, resulting in an overall mining recovery of 89%.
  9. The Mineral Reserve estimate includes both planned and unplanned dilution. Planned dilution is incorporated directly into the Deswik stope shapes. Unplanned dilution consists of a 1 m stope wall overbreak allowance and an additional 2% backfill dilution allowance, resulting in an overall dilution factor of 16%.
  10. Totals may not sum due to rounding.

LOCATION & INFRASTRUCTURE

Located in Durango State, which has a history of mining and is known as a mining-friendly jurisdiction, Pitarrilla is ~160 kilometres north of Durango City, where Endeavour’s exploration office and team reside. The project is easily accessible and has excellent infrastructure, including access to the power grid and a skilled workforce.

PROPERTY DESCRIPTION

4,950 hectares (1.3 km x 0.6 km), consisting of 5 mineral concessions.

GEOLOGY

Intermediate sulphidation epithermal system.

POTENTIAL

Pitarrilla is expected to be one of the key cornerstones of Endeavour’s long-term growth profile. It is anticipated that it will be accretive on a silver equivalent resource per share, provide optionality in a rising silver price environment and help us to maintain our high exposure to silver.

Feasibility Study

Feasibility Study

Technical Reports

MINERAL RESOURCE ESTIMATE FOR THE PITARRILLA AG-PB-ZN PROJECT, DURANGO STATE, MEXICO

Photo Gallery


© 2026 Endeavour Silver Corp.
All rights reserved.